The contractors have been making a lot of progress over the past two weeks and have almost finished with the wall framing. The one area they were waiting to confirm dimensions for was the long run along the back of the house where we are installing floor to ceiling windows and several french doors.

At this point we are waiting to get the roof truss manufacturer’ revised shop drawings back to confirm that the trusses will work with the design and then we can give them the go ahead to start manufacture.